750mm & 950mm Cooling Tower Fill with 20mm Vertical Corrugations

+86 13623371227

alice@fengbeiplastic.com

Alice

750mm & 950mm Cooling Tower Fill with 20mm Vertical Corrugations

This cooling tower fill is available in 750mm and 950mm widths, with a 20mm corrugation pitch and a 90° channel arrangement. The straight corrugated structure provides defined passages for water and airflow, making it suitable for cooling tower applications where consistent channel geometry and reliable installation are important.

Both widths can be supplied with customized lengths and sheet thicknesses. Depending on the tower structure, the fill can be assembled into glued blocks or prepared for hanging installation.

Product Specifications

  • Available Widths: 750mm, 950mm
  • Length: Customizable
  • Thickness: Customizable
  • Corrugation Pitch: 20mm
  • Corrugation Angle: 90°
  • Materials: PVC, CPVC, PP
  • Connection Method: Glue or hang

Corrugated Structure and Installation

The 20mm pitch creates relatively open flow passages compared with tighter corrugation designs. The 90° arrangement keeps the channel layout straightforward, which can be useful when matching replacement fill to an existing tower configuration.

For glued assemblies, the sheets can be formed into blocks according to the required packing dimensions. Hanging installation is also available where the tower uses a suitable support arrangement. The installation method should be confirmed against the existing fill support system before production.

Material and Size Options

PVC, CPVC, and PP are available to accommodate different operating conditions. Material selection should take into account circulating water temperature, water chemistry, and the tower's service requirements rather than dimensions alone.

The 750mm and 950mm width options, together with adjustable lengths and thicknesses, allow the fill to be produced for different packing layouts. For replacement projects, existing sheet dimensions and support details can be used to confirm the required configuration.

We support customized production based on tower dimensions, material requirements, and installation arrangements, helping customers obtain fill that fits their equipment without unnecessary modifications to the existing structure.

David Anderson / Cooling System Engineer

We purchased cooling tower fill media for our power plant cooling system upgrade. The product arrived in excellent condition and the installation process was ve

Laura Schneider / Technical Purchasing Manager

After comparing several suppliers, we selected this company because of their technical communication and product customization ability. The cooling tower fill m

Kenji Tanaka / Mechanical Engineer

The cooling tower fill quality is very consistent and meets our engineering requirements. The material design provides stable water distribution and helps maint

Ananya Patel / Project Coordinator

We ordered cooling tower fill for multiple cooling tower replacement projects. The supplier provided clear technical information, reasonable lead time, and good

What water flow conditions can your cooling tower ...
Our cooling tower fill media is designed for continuous water distribution with stable heat transfer performance. Customized fill structures can be developed to meet different cooling tower designs an
Does your cooling tower fill media support fire re...
Yes, standard PVC cooling tower fill media is designed with flame-resistant properties and tested under industry standards. Additional material options can be discussed according to specific project c
What is the standard production time for cooling t...
Typical production time is about 5–7 weeks after order approval, depending on order quantity and customization details. Flexible scheduling options can be discussed according to project requirements.
Do you provide cooling tower fill media installati...
We can assist with technical guidance and recommend experienced service partners worldwide. Remote support and on-site coordination by our engineers can also be arranged.

PROFESSIONAL COOLING TOWER FILL MANUFACTURER | QUALITY & SERVICE SUPPORT

Blog

Industry trends and cooling tower fill media insights for global customers.

Contact Us

Connect with our team for cooling tower fill media details, project information, and technical assistance.

Chat on WhatsApp